Autor
|
Titel
|
Jahr
|
Band Seite
|
|
|
|
|
|
|
Ruch C., Schatzl R., Maracek K., Rock G. and Plieschnegger M. |
EXTRACTING 1D RIVER CROSS-SECTIONS OUT OF 2D FLOODING STUDIES - EXAMPLE FROM STYRIA AND BURGENLAND - AUSTRIA |
2012 |
1 329 - 337 |
|
Ruch C., Schatzl R., Maracek K., Rock G. and Poltnig W. |
EXTRACTING 1D RIVER CROSS-SECTIONS OUT OF 2D FLOODING STUDIES - EXAMPLE FROM STYRIA AND BURGENLAND-AUSTRIA |
2012 |
EA 332 - 333 |
|
Jošt Sodnik, Pavel Debeljak, Jure Bogataj and Urška Petje |
Extreme flash floods in October 2014 and neglected torrent control - case study of the Hotovlja valley, Slovenia |
2016 |
EA 324 - 325
|
|
Petrascheck A. |
EXTREME HOCHWASSER - WIE WEIT KÖNNEN UND MÜSSEN WIR UNS SCHÜTZEN |
2004 |
4 IX/147 - IX/157 |
|
Kuang-Jung TSAI, Jie-Lun CHIANG and Yie-Ruey CHEN |
Extreme Rainfall Induce Hydrological Environment Variation Assessment by Using IHA (Indicator of Hydrologic Alteration) in Taiwan |
2018 |
EA 126 - 127 |
|
Grisotto S. and Valentinotti R. |
EXTREME TORRENT EVENTS IN THE HAZARD MAPPING AND LANDUSE PLANNING IN THE AUTONOMOUS PROVINCE OF TRENTO - THE AUGUST 15, 2010 DEBRIS FLOW IN THE VAL MOLINARA TORRENT (CAMPOLONGO DI PINÈ - TRENTINO - ITALY) |
2012 |
EA 150 - 151 |
|
Andreas RIMBÖCK, Johannes HÜBL and Rainer HÖHNE |
Extreme Torrential Flooding at Simbach on June 1st, 2016 - Key Finding of a Detailed Event Analysis - |
2018 |
1 170 - 176
|
|
Andreas RIMBOECK and Johannes HUEBL |
Extreme Torrential Flooding at Simbach on June 1st, 2016 Ð Finding of a Deailed Event Analysis Ð |
2018 |
EA 212 - 213 |
|
HEIGL F. |
Für eine dynamische Zonenausweisung. |
2000 |
2 253 - 265 |
|
Ishikawa Y. |
FACTORS AFFECTING FAILING MATERIAL FLUIDIZATION AND A METHOD FOR PREDICTING THE RUN-OUT DISTANCE OF MASS MOVEMENTS [Extended Abstract] |
2008 |
EA 194 - 195 |
|
K. Woldearegay, W. Schubert, K. Klima and A. Mogessie |
Failure Mechanisms and Influencing Factors of Landslides Triggered by Heavy Rainfalls in Adishu Area, Northern Ethiopia |
2006 |
1 65 - 71 |
|
Yasuo Ishii, Satoshi Tsuchiya, Masamichi Yagi and Ryoko Nishii |
Failure time prediction using the Saito method and evacuation notices in the Kadoshima landslide, Japan |
2016 |
EA 348 - 349
|
|
Gerber W. and Volkwein A. |
FALLVERSUCHE AUF BODENMATERIAL - MESSUNG DER VERZÖGERUNG |
2012 |
1 143 - 149 |
|
HERZOG B., LEHMANN CH., SPREAFICO M. |
Fehlerquellen und Ermessensspielraum bei der Beurteilung des Feststoffpotentials in Wildbächen. |
2000 |
3 129 - 141 |
|
Scotton P., Helfer U. |
FIELD ANALYSIS OF SOME SENSORS FOR SNOW PHYSICAL PARAMETERS MEASURAMENT |
2004 |
1 III/283 - III/294 |
|
Lin M.-L., Chang K.-T., Dong J.-J. |
FIELD AND NUMERICAL INVESTIGATIONS OF THE HUNTAIPING LANDSLIDES, TAIWAN |
2010 |
343 - 347 |
|
Hiroaki TSUNAKAWA, Toshiharu ARISAWA, Yotaro NISHI, Yohei NAGAREKAWA, Tsuyoshi IKESHIMA, Takahiro ITOH, Takashi NAKAYAMA, Shinyu KATO and Takahisa MIZUYAMA |
Field Investigation for Yielding of Sediment and Logs due to Nashizawa Debris Flow Events in 2014 |
2018 |
EA 256 - 257 |
|
Naoki Fujimura, Takeshi Shimizu, Shiki Yoshinaga, Tadanori Ishizuka, Satoshi Tagata, Hitoshi Katoh and Takahisa Mizuyama |
Field measurement of debris flow using the force plate and a laser profile scanner |
2016 |
EA 88 - 89
|
|
Matthias Redtenbacher, Josef Schneider, Gabriele Harb, Oliver Sass, Johannes Stangl, Martin Oberlechner, Georg Heinrich, Andreas Gobiet and Tani Satyanarayana |
Field measurements in an alpine catchment to evaluate impact of the ongoing climate change on the future sediment yield |
2016 |
EA 150 - 151 |
|
Liang W.-L., Kosugi K., Mizuyama T., Musashi Y. |
FIELD OBSERVATIONS AND NUMERICAL EXPERIMENTS TO ASSESS THE EFFECT OF TREES ON SLOPE STABILITY |
2010 |
476 - 485 |
|
Takao HONDA, Kotaro FUKUI, Hajime IIDA, Toshiaki SHIRAISHI and Hiromi MOTOHARA |
Field Trip to Observe the SABO Works of the Tateyama Caldera |
2018 |
EA 318 - 319 |
|
Dorren L., Arnold P. and Sandri A. |
FIRST RESULTS FROM THE SWISS WIDE NATURAL HAZARD AND RISK ASSESSMENT ON NATIONAL ROADS |
2012 |
EA 98 - 99 |
|
Liener S., Caduff U. and Roth H. |
FIXING DESIGN FLOOD CONSIDERING - FLOOD EVENT CYCLE AND THRESHOLD PROCESSES |
2012 |
EA 236 - 237 |
|
Shusuke MIYATA, Masaharu FUJITA, Takuji TERATANI and Hirofumi TSUJIMOTO |
Flash Flood due to Local and Intensive Rainfall in an Alpine Catchment |
2014 |
EA 88 - 89 |
|
Shusuke MIYATA, Masaharu FUJITA, Takuji TERATANI, Hirofumi TSUJIMOTO |
Flash Flood due to Local and Intensive Rainfall in an Alpine Catchment |
2014 |
1 256 - 263 |
|
Simon Lumassegger, Stefan Achleitner, Robert Klar and Bernhard Kohl |
Flash flood formation in pre-alpine landscape – impact of the spatial distribution of storm events |
2016 |
EA 128 - 129 |
|
Adam Pamudji RAHARDJO, Adi Putri Anisa WIDOWATI, Shusuke MIYATA, Djoko LEGONO and Joko SUJONO |
Flash Flood Model Behavior and Calibration of Kali Putih and Nasiri Watershed |
2018 |
EA 192 - 193 |
|
Javelle P., Defrance D., Mériaux P., Liébault F., Navratil O., Segel V. and Westrelin S. |
FLASH FLOOD WARNING SYSTEM IN MOUNTAINOUS AREAS USING X-BAND WEATHER RADARS - SOME PRELIMINARY RESULTS OBTAINED IN THE FRAMEWORK OF THE "RHYTMME"" PROJECT" |
2012 |
EA 192 - 193 |
|
Lamovec P., O_tir K. and Miko_ M. |
FLASH FLOODS AND PEAK DISCHARGE ESTIMATION - THE SEL_KA SORA RIVER FLASH FLOOD IN SEPTEMBER 2007, W SLOVENIA |
2012 |
EA 228 - 229 |
|
Lamovec P., Oštir K. and Mikoš M. |
FLASH FLOODS AND PEAK DISCHARGE ESTIMATION - THE SELŠKA SORA RIVER FLASH FLOOD IN SEPTEMBER 2007, W SLOVENIA |
2012 |
1 201 - 210 |
|
Corinna WENDELER, Matthias DENK and Nobuhito NISHIMURA |
Flexible Ring Net Barriers for Debris Flow Protection - Learning from More Than 10 Years of Experience - |
2018 |
EA 32 - 33 |
|
MUHAR S. |
Fließgewässer - Kartierung als Grundlage für die Entwicklung ökologisch orientierter Schutzkonzepte. |
1996 |
5 119 - 129 |
|
Alberto Bisson and Simonetta Cola |
Floating anchors for the stabilization of Cischele landslide in the Venetian Prealps |
2016 |
EA 288 - 289
|
|
Hilker N., Hegg C., Zappa M. |
FLOOD AND LANDSLIDE CAUSED DAMAGE IN SWITZERLAND 1972-2007 WITH SPECIAL CONSIDERATION OF THE FLOOD IN AUGUST 2005 [Extended Abstract] |
2008 |
EA 166 - 167 |
|
TECCA P.R., MARCHI L., PASUTOA., SILVANO S. |
Flood and landslides: A methodological approach for research and watershed planning. [Überschwemmung und Bergrutschungen: Methoden der Forschung und Planung von Einzugsgebieten.] |
1992 |
5 129 - 140 |
|
Netzer M. |
FLOOD CONTROL ILL-GÖFIS, RETENTION AREA SCHILDRIED [Extended Abstract] |
2008 |
EA 314 - 315 |
|
Frei P., Riedl J. |
FLOOD CONTROL IN GARMISCH-PARTENKIRCHEN (BAVARIA) KANKER - PARTNACH PROTECTION SYSTEM COMBINED DYNAMIC CONTROL OF FLOOD DISCHARGE BASED ON A PRECIPITATION - DISCHARGE - MODEL INCLUDING A RETENTION BASIN FOR THE STORAGE OF THE PEAK DISCHARGE. [Extended Abstract] |
2008 |
EA 104 - 105 |
|
Berwert J., Wüthrich T., Gertsch E. |
FLOOD CONTROL IN THE SARNERAA VALLEY PARTICIPATIVE PLANNING OF PREVENTIVE MEASURES AFTER THE 2005 FLOODS [Extended Abstract] |
2008 |
EA 40 - 41 |
|
Manser M. |
FLOOD CONTROL PROJECTS: BREGENZERACH IN AU, MELLAU, AND BEZAU-REUTHE [Extended Abstract] |
2008 |
EA 278 - 279 |
|
Markus W. Klauser, Christian Willi, Werner Fessler and Josef L.A. Eberli |
Flood corridors to handle residual risk |
2016 |
1 763 - 770
|
|
ZHANG W., HORLACHER H.B. |
Flood dammage estimation based on partial distribution and nonparametric frequency. [Schätzung des Überschwemmungs-Schadens auf grundlage partieller Verteilung und nonparametrischer Häufigkeit.] |
1992 |
3 159 - 166 |
|
Le Coz J., Dramais G., Benmamar D. and Gallavardin A. |
FLOOD DISCHARGE MONITORING USING IMAGE ANALYSIS - IMPLEMENTATION AND EVALUATION OF PERMANENT STATIONS |
2012 |
EA 230 - 231 |
|
Rickenmann D., Hunzinger L., Koschni A. |
FLOOD EVENTS AND SEDIMENT TRANSPORT DURING THE RAINSTORM OF AUGUST 2005 IN SWITZERLAND [Extended Abstract] |
2008 |
EA 342 - 343 |
|
DJOROVIC M. |
Flood flows in relation to watershed morphological characteristics. [Beitrag zur Kenntnis der Hydrographie kleiner hängiger Einzugsgebiete.] |
1984 |
2 181 - 191 |
|
Jordan F., Garcia Hernandez J., Boillat J.-L., Schleiss A. |
FLOOD FORECAST AND FLOOD MANAGEMENT MODEL - OPTIMIZATION OF THE OPERATION OF STORAGE POWER PLANTS FOR FLOOD ROUTING |
2008 |
1 141 - 151 |
|
Jordan F., Hernandez J.G., Boillat J.L., Schleiss A. |
FLOOD FORECAST AND FLOOD MANAGEMENT MODEL OPTIMIZATION OF THE OPERATION OF STORAGE POWER PLANTS FOR FLOOD ROUTING [Extended Abstract] |
2008 |
EA 202 - 203 |
|
GILIÉN-HOFER A. |
Flood forecasting on the Zala river by a discrete cascade model.[Hochwasservorhersage für den Zala-Fluß mittels diskreten Kaskadenmodells. |
1984 |
3 293 - 301 |
|
Matthias Huttenlau, Johannes Bellinger, Paul Schattan, Kristian Förster, Felix Oesterle, Katrin Schneider, Stefan Achleitner, Johannes Schöber, Georg Raffeiner and Robert Kirnbauer |
Flood forecasting system for the Tyrolean Inn River (Austria): current state and furtherenhancements of a modular forecasting system for alpine catchments |
2016 |
1 909 - 916
|
|
Karagiorgos K., Chiari M. and Huebl J. |
FLOOD HAZARD ASSESSMENT VALIDATION BASED ON THE FLOOD RISK DIRECTIVE 2007/60EU - A CASE STUDY IN RAFINA (ATTICA, GREECE) CATCHMENT |
2012 |
EA 202 - 203 |
|
Karagiorgos K., Chiari M. and Hübl J. |
FLOOD HAZARD ASSESSMENT VALIDATION BASED ON THE FLOODS RISK DIRECTIVE 2007/60/EC - A CASE STUDY IN RAFINA (ATTICA, GREECE) CATCHMENT |
2012 |
1 509 - 517 |
|